Got the bridge installed and control cavity routered out and the pots / killswitch / and toggle switches installed. I used a forstner bit to set them all down into the body by 1/4 looks sharp I think.
Read more…
Thanks Tom the knobs are also inserted down into the body. They look cool but a real pain in the ass to get the nuts started but thats what the customer wanted so thats what he gets. Lol
@ rat i took the easy way and drilled the holes at an angle and i also angled the neck down some more like on a gibson i hope it works out. The neck is now 1/8 above the body and the saddle holes are angled so i figure i have another 1/8to play with in action. We will see as i got a lot done on her today as in pickups installed and all wiring holes drilled and pickguard done.
Comments
lookin gud ;-)
Yup, very cool with the inset!